- Details
- Written by: admin
- Category: terms
- Hits: 1330
This is the best estimate of construction date if it is not known precisely. E.g. the construction likely took place between 1930 and 1940, so the year entered is 1935.
- Details
- Written by: admin
- Category: terms
- Hits: 374
Structural steel members are welded together. This usually only applies to regular-weight steel members.
Welded connection of steel brace to gusset plate, New Zealand (A. Charleson)
Welded steel brace connection, USA (S. Brzev)
- Details
- Written by: admin
- Category: terms
- Hits: 290
The building footprint is approximately triangular in shape, or a tapered wedge shape, and it has an open internal courtyard (Δ).
- Details
- Written by: admin
- Category: terms
- Hits: 1177
Number of storeys or floors above ground, including the ground floor and floors above. Also includes storage and mechanical plant levels only if these cover over 50% of the plan area, but does not include basements below ground. If the building is stepped in height, then record the number of storeys of the highest part.
The number of storeys above ground can be recorded as an exact number, or as a range, or as an approximate number if the exact number is not known. It can also be recorded as unknown.